This location also needs all the other Supercharger back-end equipment besides the switchgear which looks like it's already been installed. However, as a partial balance against the waiting for Tesla, if that utility transformer in the background of the first picture is for the superchargers, then maybe there won't be much of a delay in getting the site energized and activated once Tesla gets their own equipment sorted out.I think once the log jam of pedestal manufacturing clears, all these sites will open in rapid succession.