My delivery is scheduled for 28th Sept in Brisy for my P3D+ and my vin is 5171xx..
Build date is 14/08/19 but the vin tracker says my car won’t even arrive in Sydney until 04th October.
My electrician is booked for 1st Oct to install the HPWC. Hmmmmm...could be a problem if the vin tracker is accurate. ANY THOUGHTS?
Thanks for the info. You can’t be any earlier than Melina with that build date. The other ships had left by then. So it definitely isn’t in the country yet. It will arrive Saturday night or Sunday morning (21st/22nd). 28th delivery seems very ambitious. We haven’t seen anything faster then about 12 days from ship to delivery.. Keep us in the loop if this changes.
If the delivery does indeed occur - it could indicate an outside possibility - that Long Beach was used to load. ANL W was there 18th - 20th August. Up until now, Long Beach has never been used. Oakland has been every car. The reason I am speculating this is Europe just had cars transported to Philly and moved from the east coast, for the final ship to make it to Europe before end of quarter, instead of via Panama Canal. Maybe Long Beach was used similarly for a final push.
We won’t know until your car is delivered.