cezdoc
Member
So recent activity by Tesla both westbound and eastbound.It looks like there has been some activity. Because my memory is so bad that I can't remember how this place looks despite driving through it once a week, I've managed to find a view of it on google maps to compare that is relatively recent:
The EV charging signage has gone up on 5 of the bays
Two of the chargers have been removed, with a large concrete or metal (I was there literally 30 mins ago and can't remember what they were made of) plinth put in place.
View attachment 712749
I'm probably going through the Westbound again tomorrow, so will grab a photo if there is anything interesting looking there.
Of all the changes I think the new signage is the most encouraging: the other changes could otherwise be interpreted (glass half empty scenario) as decommissioning.
In the photo above of the eastbound chargers all four V2 charger cabinets (able to power up to 8 stalls) are still in place.
The covers over the removed stalls are metal boxes if I recall correctly. I've seen them in photos taken part way through some Supercharger installs, presumably they protect the foundation, ducting and cables from the elements (and the public).