Surely the @Vedaprime's of the world would have some insight into thisHas anyone done any sort of analysis of expected output of known AU productions days v known vin allocations? Obviously there would be a lot of extrapolation and guess work, but I would be interested to see if the known production is accounted for with VINs or if there are still vins to be allocated either at sea or waiting at the factory or dock.