Timeline:
09/24 order placed with Fremont factory delivery, model X 90D, 6 seat, ap 1.0
09/30 loan application filed(before the rate bump,
10/01 order confirmed
10/02 VIN assigned 23xxx
11/07 building starts
11/12 production finishes
11/22 delivery scheduled
11/23 pick up(with the original loan rate)
I mostly followed the delivery check list but I didn't find any flaw, maybe I'm just careless.
The car is built with AP 2.0 hardware but I didn't opt in EAP yet. At this point it doesn't make any difference either since only non adaptive cruise control is working. And in general I don't trust a software delivery promise,
Will upload some pics soon, but honestly I don't think there is any difference between the other PICs you can find online.
09/24 order placed with Fremont factory delivery, model X 90D, 6 seat, ap 1.0
09/30 loan application filed(before the rate bump,
10/01 order confirmed
10/02 VIN assigned 23xxx
11/07 building starts
11/12 production finishes
11/22 delivery scheduled
11/23 pick up(with the original loan rate)
I mostly followed the delivery check list but I didn't find any flaw, maybe I'm just careless.
The car is built with AP 2.0 hardware but I didn't opt in EAP yet. At this point it doesn't make any difference either since only non adaptive cruise control is working. And in general I don't trust a software delivery promise,
Will upload some pics soon, but honestly I don't think there is any difference between the other PICs you can find online.