dhanson865
Well-Known Member
Not sure where to post this, so feel free to move if there is a more appropriate location.
Was driving through Knoxville TN and stopped at the Walmart Supercenter located 8445 Walbrook Dr. This Walmart is located just off of I-40. While parking, I noticed what appeared to be several charging stalls.
Upon closer inspection, the stalls have the Electrify America name on them and include a lcd screen and a credit card reader. There are four stalls, with each stall having 2 charge heads. Based on the parking space lines, I’m not certain how 8 vehicles can be charged at the same time. The charge cables don’t seem long enough.
7 of the 8 charge heads are CCS and 1 head is Chardemo. The chardemo head is rated “up to 50kW”, 3 of the CCS heads are rated “up to 150kW” and (surprise) 4 of the CCS heads are rated “up to 350kW”. The charge cables appear to be fluid cooled, based upon writing on them stating “1000 V - For Use Only In An Approved Cooling System”. Curious as to how long it would take to fully charge a vehicle at 350kW?
The site is complete but for the installation of the transformer. No idea when it will be operational or what the cost to charge will be.
]
That's right by my house, even closer than the superchargers (about 5 miles closer).
It'll be interesting to see what the fee structure will be. I'd never use it if it's more than 10 cents per kWh delivered since I can drive a couple of miles and charge free or at that price while I sleep/sit in the comfort of my own home. (yes there are level 2 EVSEs in Knoxville that are free, not that I ever bother to go there with a proper 240v setup at home).