I feel like someone had mentioned before that each move basically is requiring a permit from Deptford. That would be the only logical thing to make sense. As in- they installed what’s necessary and now it’s like ok new permit to have AC Electric or whoever come put the meter in and activate.
Probably right, but still ridiculous.