Looks like there is more to do than I previously thought. The transformer is not in the brick enclosure. It is somewhat “across the street”, on the far end of the charge pedestals from the Tesla cabinets, over by Buffalo Wild Wings. No power cabling to the cabinets run yet. A trench needs to be made, conduits buried, etc. No meter on the transformer.
 

Attachments

  • F4A43CB6-56B7-4F23-B7DA-8B6429DDCDBE.jpeg
    F4A43CB6-56B7-4F23-B7DA-8B6429DDCDBE.jpeg
    574 KB · Views: 94
OK, thanks. That’s where the drawing from post #97 indicated it would be. I think the drawing indicates a power line is running under that bed. The drawing also gives a hint at what is in the bricked in area - 4 V3 chargers and the communications unit.

CFBA06B4-E44C-4993-A38C-389A6250F9BF.png


Interesting, usually by the time the transformer is placed on its concrete base, the conduits to the V3 chargers have already been run and any underground drilling completed. The concrete base is poured around those conduits before the transformer is placed. Obviously they are still working on a hole. So maybe they are simply connecting the power there.
 
Last edited:
Here are more pages that may be applicable
 

Attachments

  • Georgetown (Page 29).png
    Georgetown (Page 29).png
    999.8 KB · Views: 54
  • Georgetown (Page 28).png
    Georgetown (Page 28).png
    1.3 MB · Views: 61
  • Georgetown (Page 24).png
    Georgetown (Page 24).png
    944.4 KB · Views: 53
  • Georgetown (Page 23).png
    Georgetown (Page 23).png
    1.2 MB · Views: 47
  • Georgetown (Page 22).png
    Georgetown (Page 22).png
    996.6 KB · Views: 40
  • Georgetown (Page 11).png
    Georgetown (Page 11).png
    813.8 KB · Views: 50
  • Georgetown (Page 10).png
    Georgetown (Page 10).png
    874.5 KB · Views: 40
  • Georgetown (Page 9).png
    Georgetown (Page 9).png
    1.6 MB · Views: 45
  • Georgetown (Page 8).png
    Georgetown (Page 8).png
    1 MB · Views: 40
  • Georgetown (Page 7).png
    Georgetown (Page 7).png
    1.3 MB · Views: 50
This one was in permit for over a year and now in construction for several months..
Permit wasn’t issued until around 12/20/22 and construction started around 1/17/23, so finishing up 2 to 2.5 months later seems about right for an installation where they have to excavate and replace existing parking lot and individually wire chargers. This must be very close as the transformer was already installed as of 3/13/23.
 