BlueShift
Member
If anyone discovers that the south-bound side is actually not open yet send an email to me ([email protected]) and I will change the red dot back to a construction cone. Don't want anyone to end up stranded there. Superchargers
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Your wish is my command! The meter still reads 0 - somebody get up here and fix that!Hope northbound is up and running soon.
Your wish is my command! The meter still reads 0 - somebody get up here and fix that!
View attachment 69813
View attachment 69814
@tga, I take it you were there in an ICE vehicle?
@bhuwan, get up there - you could be first!
Oh man I may have to take up this challenge
'Fraid so... :redface:@tga, I take it you were there in an ICE vehicle?
Thanks. I was afraid it wasn't dark enough for for the glowing logos to show, but I had an meeting to get to, so I couldn't wait for dark.Also, gorgeous photos!
Don't be shy. It has it's own feed, so you won't take out the building. Hopefully. :wink:Has anyone charged on the Northbound side yet? I'll be passing through Hooksett tomorrow, although after "breaking" in the Southbound side I'd rather not be the first one to charge.
Anyone else think it's odd that the tap wires leading down to the SC transformer are much thicker than the overhead distribution wires?