You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Now have what looks to be yellow primer on the DCFC parking posts. And the conduit for the two handicapped spaces is now mostly in place. Also, the posts are now all bolted in place under the roof.
Going to be a challenge every fall to keep the dead leaves from getting stuck behind all that conduit. They should have left a 6" or more gap at the base for cleanout.
Guess what I saw today???
It looks like Pasadena supercharger is almost ready. Check out these pics.
(Had to jump the security fence to get this pics but it was worth it
Unfortunately, it's definitely not almost ready... Still no progress at the location of the transformer vault today and there still appears to be no cabling throughout the project.
Looks like a chain link fence will enclose the Tesla cabinets to keep the riff Raff out. They poured concrete over the buried conduit along the garage. I almost missed that. More dirt moved around the hole, with some busted up pieces finding their way in somehow.
I'm trying to get inside the head of the guy operating the bobcat. Dig dirt out, fill it in, expand the size, dig dirt out, fill back in. My employer frowns on the consumption of halucinagenic drugs, so I'm relegated to showing up every day, taking pictures, and pondering for long sober hours over what is going on.