Can anyone suggest what it is about my car that keeps it from being produced? Maybe they only install towing packages one day a month? It was frustrating to see inventory cars rolling out, but not my car when they were pushing so hard for Q2 deliveries. I'm willing to delete the towing if it gets me a match, but otherwise...I want what I want. Ordered May 10th. Towing added about two weeks later. Current EDD use July 2-16 with no VIN assigned.
Model Y Long Range Dual Motor All-Wheel Drive
Deep Blue Metallic Paint
19’’ Gemini Wheels
Black and White Premium Interior
Five Seat Interior
Autopilot

Enhanced Autopilot
Tow Hitch
I am in a similar boat. Waiting for my MYLR Red. Ordered on May 6th. Have watched a lot of inventory and ordered cars go out the door. Thought the end of Q2 would be the end of the wait. But no EDD July 6th-14th. Going to be damn near melancholy if it gets pushed out again. Lol
 
2023 MYLR White | Black | 5-Seat | Gemini |
OD: 5/18 2023
ODD: Jun - Jul
EDD: 6/13 - 6/30
Fremont VIN Assigned: 6/6
Order on Hold: 6/8
Hold Removed: 6/22
Austin VIN Assigned: 6/23
Austin VIN Released: 6/24
Fremont VIN Assigned: 6/30
EDD: 7/13 - 7/19
EDD: 7/7 - 7/14
Scheduled Delivery: 7/11
MVPA updated to reflect the new loyalty credit of $500, pushing delivery to July just became more sweet.
 
MYLR
Red
5 Seat Black Interior
19" Gemini
OD: May 6
ODD: May-June
EDD: Jun 2 - Jun 30
EDD2: Jun 14 - Jun 28
EDD4: Jun 20 - Jun 30
EDD5: Jun 21 - June30
EDD6: Jul 06 - Jul 14
EDD7: Jul 11 - Jul 19
VIN: Jun 22 7SAYGDEE7PA145xxx
Location: Portland Oregon


Yet another delay. Friggin' Tesla... 😡
 
MYLR
Red
5 Seat Black Interior
19" Gemini
OD: May 6
ODD: May-June
EDD: Jun 2 - Jun 30
EDD2: Jun 14 - Jun 28
EDD4: Jun 20 - Jun 30
EDD5: Jun 21 - June30
EDD6: Jul 06 - Jul 14
EDD7: Jul 11 - Jul 19
VIN: Jun 22 7SAYGDEE7PA145xxx
Location: Portland Oregon


Yet another delay. Friggin' Tesla... 😡
Received delivery day and scheduled delivery for 7/15. Woot woot.
 
MYLR 7 seats, 19" wheels, white red exterior, black interior, no tow.

OD 5/20 in Colorado
EDD1 June-July
EDD2 June 9-June 23.
VIN assigned on 6/4, Fremont, matrix, HW4.
EDD3 - June 21-June 30.
EDD4 - June 10-June 19.
Tesla contacted me to schedule delivery on June 11. The options given to me were June 15, 16, or 17.
Hold on 6/12/23. VIN unassigned
Released hold on 6/26/23. Changed color to red.
EDD5 - June to July (updated 7/1)
EDD6 - July to August (updated 7/4)

Hold was a max of 2 weeks, which I did to qualify for a state tax incentive.
VIN assigned on 7/7 and delivery window revised to 7/20-7/27
 
MYLR
White
19 inch Gemini's
5 Seat Black Interior
Tow Hitch
OD: May 8
ODD: June/July
EDD1: May 27-June 10
EDD2: June 4-June 10
EDD3: May 29-June 7
VIN1: May 22
Manufactured1: May 22 Fremont
DD1: June 5
Order placed on Hold: June 1
Hold Expired: June 15th
EDD4: June 29-30
VIN2: June 16th (PF807XXX)
Manufactured2: ??? Fremont
VIN2 Removed: June 20th
VIN3: June 22nd (Austin)
VIN3 Removed: June 23rd
Order placed on Hold Until July 1: June 23
VIN4: June 28 (Freemont)
VIN4 Rejected at delivery: July 1 (roof seal problem)
Order placed on Hold until July 3rd: July 1
EDD5: July 1- July 8
VIN5: July 4
Manufactured5: July 3 (Fremont)
EDD6: July 7 - July 14
EDD7: July 14 - July 23
Denver, CO

Bummer again. EDD delayed a week and now includes a period where I will be out of town and unable to take delivery.
 
2023 MYLR White | Black | 5-Seat | Gemini |
OD: 5/18 2023
ODD: Jun - Jul
EDD: 6/13 - 6/30
Fremont VIN Assigned: 6/6
Order on Hold: 6/8
Hold Removed: 6/22
Austin VIN Assigned: 6/23
Austin VIN Released: 6/24
Fremont VIN Assigned: 6/30
EDD: 7/13 - 7/19
EDD: 7/7 - 7/14
Scheduled Delivery: 7/11
7/8 received a message that the car is onsite and available for pickup, so jumped on it and took delivery 3 days sooner.

Car is perfect, no issues whatsoever. Finally graduated. Good luck to whoever is still waiting.
 
Whelp, got the Y today. Super happy with the delivery process. Panel gaps looks great. A small chip and a small scratch to have fixed. The rear diffuser had a misalignment on one corner but had the SA document these so I could schedule a repair appt. Good luck to the rest of the May orders.
IMG_20230710_163557_01.jpg
 
Whelp, got the Y today. Super happy with the delivery process. Panel gaps looks great. A small chip and a small scratch to have fixed. The rear diffuser had a misalignment on one corner but had the SA document these so I could schedule a repair appt. Good luck to the rest of the May orders.View attachment 955068
Congrats!!! Nice color. This angle looks like Plum Red color to me. So special.
 
  • Like
Reactions: Stroudco2005
MYLR
White
19 inch Gemini's
5 Seat Black Interior
Tow Hitch
OD: May 8
ODD: June/July
EDD1: May 27-June 10
EDD2: June 4-June 10
EDD3: May 29-June 7
VIN1: May 22
Manufactured1: May 22 Fremont
DD1: June 5
Order placed on Hold: June 1
Hold Expired: June 15th
EDD4: June 29-30
VIN2: June 16th (PF807XXX)
Manufactured2: ??? Fremont
VIN2 Removed: June 20th
VIN3: June 22nd (Austin)
VIN3 Removed: June 23rd
Order placed on Hold Until July 1: June 23
VIN4: June 28 (Freemont)
VIN4 Rejected at delivery: July 1 (roof seal problem)
Order placed on Hold until July 3rd: July 1
EDD5: July 1- July 8
VIN5: July 4
Manufactured5: July 3 (Fremont)
EDD6: July 7 - July 14
EDD7: July 14 - July 23
Denver, CO

Ugh. Tesla told me on July 1st it would be a couple of days for a new car to arrive. This week they told me the car would arrive by the end of this week. Now it has slipped into early next week. Next week starts to become impossible to take delivery as I am away, and I have communicated those delivery blackout dates to them for many weeks. Frustrated as this feels like their fault for delivering a new car to me with quality issues that they refused to correct so I had to reject it and they provided guidance of a "couple of days" which is now weeks.
 
MYLR
White
19 inch Gemini's
5 Seat Black Interior
Tow Hitch
OD: May 8
ODD: June/July
EDD1: May 27-June 10
EDD2: June 4-June 10
EDD3: May 29-June 7
VIN1: May 22
Manufactured1: May 22 Fremont
DD1: June 5
Order placed on Hold: June 1
Hold Expired: June 15th
EDD4: June 29-30
VIN2: June 16th (PF807XXX)
Manufactured2: ??? Fremont
VIN2 Removed: June 20th
VIN3: June 22nd (Austin)
VIN3 Removed: June 23rd
Order placed on Hold Until July 1: June 23
VIN4: June 28 (Freemont)
VIN4 Rejected at delivery: July 1 (roof seal problem)
Order placed on Hold until July 3rd: July 1
EDD5: July 1- July 8
VIN5: July 4
Manufactured5: July 3 (Fremont)
EDD6: July 7 - July 14
EDD7: July 14 - July 23
Denver, CO

Ugh. Tesla told me on July 1st it would be a couple of days for a new car to arrive. This week they told me the car would arrive by the end of this week. Now it has slipped into early next week. Next week starts to become impossible to take delivery as I am away, and I have communicated those delivery blackout dates to them for many weeks. Frustrated as this feels like their fault for delivering a new car to me with quality issues that they refused to correct so I had to reject it and they provided guidance of a "couple of days" which is now weeks.

Hang in there. I had to reject my first delivery due to quality issues too. Got a new VIN assigned in a few days but the EDD is pushed to the last week of July. I believe this is just how long it takes to ship the car.
 
Hang in there. I had to reject my first delivery due to quality issues too. Got a new VIN assigned in a few days but the EDD is pushed to the last week of July. I believe this is just how long it takes to ship the car.
What's amazing is how many get rejected. I've seen dozens here on TMC, and this site just represents a sampling of new Teslas overall. Makes you wonder how they manage to get rid of them. Are there that many people out there who will buy a car without even looking at the body panels, paint, roof gasket, etc.?
 
What's amazing is how many get rejected. I've seen dozens here on TMC, and this site just represents a sampling of new Teslas overall. Makes you wonder how they manage to get rid of them. Are there that many people out there who will buy a car without even looking at the body panels, paint, roof gasket, etc.?
I'd say people on this site are less tolerant on body panel issues and etc. I have quite some friends just don't care too much about theses stuff and of course they don't come to this site.
 
MYLR 7 seats, 19" wheels, white red exterior, black interior, no tow.

OD 5/20 in Colorado
EDD1 June-July
EDD2 June 9-June 23.
VIN assigned on 6/4, Fremont, matrix, HW4.
EDD3 - June 21-June 30.
EDD4 - June 10-June 19.
Tesla contacted me to schedule delivery on June 11. The options given to me were June 15, 16, or 17.
Hold on 6/12/23. VIN unassigned
Released hold on 6/26/23. Changed color to red.
EDD5 - June to July (updated 7/1)
EDD6 - July to August (updated 7/4)

Hold was a max of 2 weeks, which I did to qualify for a state tax incentive.
Delivery estimation revised on 7/13 to July 15-July 25. Almost there...