Ramisanders
Member
Lets All post our string code to compare here mine:
Ordered June 7th, Confirmed 14th, Vin 123XX, DS is Saying Car going into production by 8-15, 7 days to build (21st), and 3 week to transport (9-14). Then About 5 Days for inspection and details. So my string of code sound to be right on point. Anyone else having this coincidence. (sorry for the large text
date_dropdown" class="form-select"><option value="2016-09-19|first-available">First Available</option><option value="2016-09-19">Late September</option><option value="2016-10-01">October</option><option value="2016-11-01">November</option><option value="2016-12-01">December</option><option value="2017-01-01">January, 2017</option><option value="2017-02-01">February, 2017</option></select>
Ordered June 7th, Confirmed 14th, Vin 123XX, DS is Saying Car going into production by 8-15, 7 days to build (21st), and 3 week to transport (9-14). Then About 5 Days for inspection and details. So my string of code sound to be right on point. Anyone else having this coincidence. (sorry for the large text
date_dropdown" class="form-select"><option value="2016-09-19|first-available">First Available</option><option value="2016-09-19">Late September</option><option value="2016-10-01">October</option><option value="2016-11-01">November</option><option value="2016-12-01">December</option><option value="2017-01-01">January, 2017</option><option value="2017-02-01">February, 2017</option></select>