There is currently only a pole transformer servicing Heatherbrae Pies. I am assuming there will be either a new kiosk substation put in or maybe if that is not possible we might see a megapack install and maybe that is when a 4 stall per cabinet is more likely used with the megapack able to supplement the power coming from the two 350kW cabinets. (Seems that different generations of v3 cabinets range in at least the 350kVA to 387kVA)
We now need photos of the cabinet for its face rating, see linked post by @Chuq