If the site had ever been fully open with all 8 stalls working, then SC.info would list it as 8 instead of 4. But so far, while there are 8 charging posts physically installed at the location, only 4 of them have ever been powered up. Once that changes, the site will update the listing back to 8.@BlueShift Fargo ND location has 8 stalls not 4. Photos and Tesla official site confirm 8 stalls.