2pm Wednesday 18th Still work in progress underground work it seems.
 

Attachments

  • D17D3A01-E779-4D54-BDD2-76AB813F50EA.jpeg
    D17D3A01-E779-4D54-BDD2-76AB813F50EA.jpeg
    347.3 KB · Views: 104
  • 31C66ADC-EC33-4573-92EF-B786B2973FFC.jpeg
    31C66ADC-EC33-4573-92EF-B786B2973FFC.jpeg
    994.6 KB · Views: 75
  • D892DEE8-289B-46C6-8973-DF11EBE442A4.jpeg
    D892DEE8-289B-46C6-8973-DF11EBE442A4.jpeg
    787.4 KB · Views: 68
Update: Friday 20th at 3:30am still not live. Underground section that was dug is now filled in.
Well, I was excited about this location opening UNTIL last night, when I heard the US and Canada will be closing their borders. Was planning on a trip from MI to WNY soon and charging here but that ain't going to happen even if it is live shortly. Guess by summer it should be good to go...
 
Power transformer in place. Signs added.

Can’t tell if they are working since I have an ICE vehicle over here.
 

Attachments

  • B00D80C7-B938-4DF0-B485-9F8A954C04E2.jpeg
    B00D80C7-B938-4DF0-B485-9F8A954C04E2.jpeg
    325.5 KB · Views: 66
  • 716D21CE-8F3B-4820-BE8E-029FB2CDD132.jpeg
    716D21CE-8F3B-4820-BE8E-029FB2CDD132.jpeg
    264.9 KB · Views: 66
  • A94A325A-E98C-434B-B163-50DB364258B6.jpeg
    A94A325A-E98C-434B-B163-50DB364258B6.jpeg
    356.3 KB · Views: 59
  • E754AD03-ABD9-4244-B962-4D46B2415A01.jpeg
    E754AD03-ABD9-4244-B962-4D46B2415A01.jpeg
    367.8 KB · Views: 57
Power transformer in place. Signs added.

Can’t tell if they are working since I have an ICE vehicle over here.

Doesn't seem likely...the meter is not yet installed. And considering the transformer apparently only showed up in the past couple of days, it's also unlikely everything is connected and inspected. I would say there is still a ways to go on this one.
 
  • Like
Reactions: mociaf9 and Soey22
Maybe final checks? But until the power meter 'head' is installed (which I am sure is not done by a Tesla employee) and the line energized, it is still a waiting game, albeit one that is getting closer!

Thanks for the update!
Are we sure the metre isn't installed yet?

Usually the post above describing what the Tesla employee is doing on site means the activation of the supercharger is imminent. In fact, writing now at 7pm EDT, I would bet they are already active. Someone should drive by and see if the TESLA logos are lit up.
 
Are we sure the metre isn't installed yet?

Usually the post above describing what the Tesla employee is doing on site means the activation of the supercharger is imminent. In fact, writing now at 7pm EDT, I would bet they are already active. Someone should drive by and see if the TESLA logos are lit up.

In the picture posted by @CanadaGoose Wednesday afternoon, the metre (sorry for my misspelling earlier--this is Canada we are talking about!) was definitely not installed (I don't know when the picture was taken, but I assume it was Wednesday). Of course the report that Tesla was on site was from Thursday, so it's possible the metre could have been installed and the transformer energized in the intervening time. That would be an incredible turnaround time from the transformer being set and being powered on.

It is interesting that Tesla (or their contractors) would have to be onsite after the transformer installation, but before power was connected, but maybe there was some additional work they were doing, not related to final inspection.