Any update on this one. Morgantown to Wythville is out of reach without a painfully slow hour or two stop in Flatwoods at tge Days Inn.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Any update on this one. Morgantown to Wythville is out of reach without a painfully slow hour or two stop in Flatwoods at the Days Inn.
Drove up into the mountains yesterday and stopped by this site for Dino juice and a couple of pics.
Progress is being made but still probably 6-8 weeks until it opens. Probably 3 more weeks of construction plus whatever delays from getting power turned on and commissioned by Tesla.
This is a bit of tight squeeze to get this built in this existing location. It is right by US Highway 33 / 48 / 219 and easily visible though.
In the past, Tesla has installed a temporary supercharging pallet nearby. Salem, VA is a good example. They put a pallet at a Sheetz a few miles away while the primary location was under construction. It will be interesting to see what they do in this case.This sign is posted at the Weston Supercharger. The clerk inside the store said the Supercharger will be closing as well as the store. I wonder if there is any way to confirm this closing with Tesla.View attachment 852758
Bad timing. The Tesla map is showing Sutton opening in Q4.This sign is posted at the Weston Supercharger. The clerk inside the store said the Supercharger will be closing as well as the store. I wonder if there is any way to confirm this closing with Tesla.View attachment 852758
The first entrance is taped off and a dump truck and back hoe are parked in front of the chargers. The rear entrance is open but appears to be for construction use only.Would someone in the area please confirm that the Superchargers are unavailable while the Sheetz is being renovated?