You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Vin Date: 10/10/2016
Production Start: 11/19/2016
Production End: 11/22/2016
Paramus, NJ
Will keep you posted -- who is your DS -- Joe P?Vin Date:11/21/2016
Also picking up in Paramus
I hope they pump them out quicker to get it before year's end.
Congratulations!! You'll probably have it sooner than predicted.
Sabino Sellitto....Will keep you posted -- who is your DS -- Joe P?
I spoke to him a few times as well -- he is very nice ..Sabino Sellitto....
Vin Date: 10/10/2016
Production Start: 11/19/2016
Production End: 11/22/2016
Paramus, NJ
I don't know how to add my data to itYou guys are all keeping the spreadsheet updated, right? I know I check it several times a day.
Model S Order & Delivery 2016
Vin Date: 10/21/16
Also delivering to Paramus
DS said hitting production in next week (by 11/30)
I hope my car is on the same train as Ojas'! Want that early Christmas present. . .
To me it looks like they are bunching up orders that have the same destination. From the chart it looks to me as though some cars go into production and week after the vin and some don't. I'm assuming my car will be going into production with yours (a week after vin) although I just ordered two days ago.
Agree. From looking at the spreadsheet, location appears to have more to do with production timing then order / vin date does. Good luck Max
A little bummed to see my estimated delivery on MyTesla change today from "December-early January" to "Late December-January." I get two weeks off around Christmas and was hoping to enjoy some drives.
Ordered: Oct. 18th
Confirmed: Oct. 25th
Not in production yet
Delivery: Washington, DC
It's an openly-editable spreadsheet, so just zoom to the last row for the appropriate tab and start typing in your info.I don't know how to add my data to it
It's an openly-editable spreadsheet, so just zoom to the last row for the appropriate tab and start typing in your info.
Vin Date: 10/21/16
Also delivering to Paramus
DS said hitting production in next week (by 11/30)
I hope my car is on the same train as Ojas'! Want that early Christmas present. . .
Has anyone been able to reverse engineer the various production schedule steps to find out when an ordered vehicle is likely to go into production, and then how long that production process takes? I posted about it on this thread, but thought I would check here.