MikeBur
ManualPilot
Was intimated above, though permit to be tracking is still Permit Details - MyBuildingPermit
Last update was moving to permit ready to be issued, on 8/20 - I believe this was future expansion for conduit to enable expansion for another 4 cabinets/8 charging posts, bringing total to 28 total potential charging posts. On 4000A switch gear, this has to be max 96kW each, so I believe this is urban Supercharger setup.
Looks like ball is completely in Tesla’s court at this point and likely to be scheduled for construction. I can’t imagine anyone doing this so close to thanksgiving, though stranger things have happened
Last update was moving to permit ready to be issued, on 8/20 - I believe this was future expansion for conduit to enable expansion for another 4 cabinets/8 charging posts, bringing total to 28 total potential charging posts. On 4000A switch gear, this has to be max 96kW each, so I believe this is urban Supercharger setup.
Looks like ball is completely in Tesla’s court at this point and likely to be scheduled for construction. I can’t imagine anyone doing this so close to thanksgiving, though stranger things have happened