Finally some progress on the transformer portion of the job. Apparently, much of the trenching has to be done by hand, to avoid disturbing the roots of Sycamore trees. Today, they installed three underground vaults, so the pace may be picking up.
 

Attachments

  • 78CC3320-2624-4BDC-BB14-EDB0CEDEF15A.jpeg
    78CC3320-2624-4BDC-BB14-EDB0CEDEF15A.jpeg
    504.4 KB · Views: 273
  • 387E808E-AEFE-4C2E-A659-8D30D3F3C13D.jpeg
    387E808E-AEFE-4C2E-A659-8D30D3F3C13D.jpeg
    821.4 KB · Views: 251
  • 4B563909-9A85-4DA0-9EA2-DA1262BF27C3.jpeg
    4B563909-9A85-4DA0-9EA2-DA1262BF27C3.jpeg
    598.4 KB · Views: 245
  • 0FCF7128-0227-4B03-9596-1C750BC68ACE.jpeg
    0FCF7128-0227-4B03-9596-1C750BC68ACE.jpeg
    503.7 KB · Views: 258
  • 9FDB92D7-C854-4D26-B9DF-729ABE30D95B.jpeg
    9FDB92D7-C854-4D26-B9DF-729ABE30D95B.jpeg
    474.7 KB · Views: 251
  • A1105E25-5967-4F47-8742-5727C1181753.jpeg
    A1105E25-5967-4F47-8742-5727C1181753.jpeg
    506.9 KB · Views: 245
  • F069C176-18A6-4BEA-AE70-DD3FF2758A3D.jpeg
    F069C176-18A6-4BEA-AE70-DD3FF2758A3D.jpeg
    475.2 KB · Views: 248
C42FE7D7-B0EB-499F-8B65-CE6C4374E1B1.jpeg
The overtime hours are yielding results.
 

Attachments

  • 3054F9F0-6841-4A49-8C8C-21A83135C785.jpeg
    3054F9F0-6841-4A49-8C8C-21A83135C785.jpeg
    476.2 KB · Views: 223
  • 9A2DD77A-237C-4D29-A748-E2B2F4B2B1AE.jpeg
    9A2DD77A-237C-4D29-A748-E2B2F4B2B1AE.jpeg
    592.8 KB · Views: 225
  • EDF54ECF-50CE-414A-9D1F-155B0FCEFEBB.jpeg
    EDF54ECF-50CE-414A-9D1F-155B0FCEFEBB.jpeg
    440.5 KB · Views: 214
  • 0F82A4C0-7841-4280-9160-A371CDB5CBEE.jpeg
    0F82A4C0-7841-4280-9160-A371CDB5CBEE.jpeg
    637.4 KB · Views: 213
  • 4C383187-6BCA-4300-A40A-BBE3B5A3F349.jpeg
    4C383187-6BCA-4300-A40A-BBE3B5A3F349.jpeg
    357.4 KB · Views: 225
  • 6594FE1C-3F4E-4BC4-8EA1-7E34C4454629.jpeg
    6594FE1C-3F4E-4BC4-8EA1-7E34C4454629.jpeg
    524.1 KB · Views: 225
Given the holidaze, I’d think 2nd week of January is safe.

However as noted above, they’re burning overtime so that would imply getting done in the next 2 weeks.

The logistics of getting presumably SCE and then Tesla to do their parts is the collective wild card.

Still and all, this will be a nice add in that area.
 
  • Like
Reactions: rrosenbl
The Super Chargers are almost ready. Friday they were finishing some wiring. Should be open soon, all 24 stalls.
 

Attachments

  • E7644BDB-C91A-4109-A1C0-7B97018D32B3.jpeg
    E7644BDB-C91A-4109-A1C0-7B97018D32B3.jpeg
    702.2 KB · Views: 200
  • B24A8139-E3AB-4BAC-B128-02CC702083B2.jpeg
    B24A8139-E3AB-4BAC-B128-02CC702083B2.jpeg
    708.6 KB · Views: 212
  • D63490D6-7489-409E-A627-455D0411C343.jpeg
    D63490D6-7489-409E-A627-455D0411C343.jpeg
    576.5 KB · Views: 214
  • BB72A6C2-EC3F-4E1F-B07D-ABC195CFDFAD.jpeg
    BB72A6C2-EC3F-4E1F-B07D-ABC195CFDFAD.jpeg
    621.6 KB · Views: 206
The Super Chargers are almost ready. Friday they were finishing some wiring. Should be open soon, all 24 stalls.
Thanks, @Iwasfuzz! Did you have a chance to see whether a big green utility transformer was sitting atop one of those concrete vaults? Were white supercharger cabinets already in place? This looks like an installation where the charging bollards for individual stalls went in early in the process. It's certainly rolling along!
 
Taken yesterday. The construction company had no idea when it will be done and open. Upon completion, Edison has to come sign off on it which I was told could take weeks.
 

Attachments

  • IMG_2185 2.jpg
    IMG_2185 2.jpg
    287.7 KB · Views: 159
  • IMG_2187 2.jpg
    IMG_2187 2.jpg
    891.1 KB · Views: 159
  • IMG_2188 2.jpg
    IMG_2188 2.jpg
    466.7 KB · Views: 162
  • IMG_2189 2.jpg
    IMG_2189 2.jpg
    165 KB · Views: 161
  • IMG_2190 2.jpg
    IMG_2190 2.jpg
    371.7 KB · Views: 164
  • IMG_2191 2.jpg
    IMG_2191 2.jpg
    484.7 KB · Views: 151
Thanks, @Iwasfuzz! Did you have a chance to see whether a big green utility transformer was sitting atop one of those concrete vaults? Were white supercharger cabinets already in place? This looks like an installation where the charging bollards for individual stalls went in early in the process. It's certainly rolling along!
I haven't seen a big green utility transformer and the 12 supercharger cabinets are off to the side of the project and still in their wooden crates, so I think we are still a ways off.
 
Wrappers are back on, many of them green and with bows. The “Tesla only” signs are not up, so spots are all ICEed. There’s also construction off to the side still.
 

Attachments

  • 8B075167-9B08-4578-A065-18AE3F8ACA20.jpeg
    8B075167-9B08-4578-A065-18AE3F8ACA20.jpeg
    605.7 KB · Views: 171
  • E5606BA3-FC53-44E9-B7AD-80DFE5271063.jpeg
    E5606BA3-FC53-44E9-B7AD-80DFE5271063.jpeg
    883.2 KB · Views: 165
  • Informative
Reactions: otter
Wrappers are back on, many of them green and with bows. The “Tesla only” signs are not up, so spots are all ICEed. There’s also construction off to the side still.
I just looked. It looks like they’re just about to power them up. Wrappers are on, but construction appears to be complete.
 

Attachments

  • 8886A6F4-CCBC-40AD-B59D-7AE20C295AB4.jpeg
    8886A6F4-CCBC-40AD-B59D-7AE20C295AB4.jpeg
    460.3 KB · Views: 150
I just wanted to add that I did not examine in detail because the parking lot was packed. It does appear that the signs are missing, and I did see some kind of fencing at the corner. But it wasn’t around the superchargers so it might not be related. Maybe that’s where the transformer goes? A portion of the superchargers were blocked off from normal traffic.
 
Stopped by this afternoon on the way to see Cavalia. Still significant construction going on. Almost all spots ICE’d, but as one should expect at this point as the lot was extremely busy, the stalls are not activated, nor is there any signage up yet (though the signage posts are in).
 

Attachments

  • 5ACE1AA7-D78A-489F-9425-D5D4DC89B2FF.jpeg
    5ACE1AA7-D78A-489F-9425-D5D4DC89B2FF.jpeg
    327.5 KB · Views: 145
  • 7D05F303-C616-4778-ACB6-BA982A358C2F.jpeg
    7D05F303-C616-4778-ACB6-BA982A358C2F.jpeg
    870.3 KB · Views: 141
Stopped by 5-d ago and a crew of 7 workers were pulling wires and were happy to talk to a Tesla enthusiast. They are "almost done" with this site, The delay in placing the Utility Transformer was due to needing an easement for placement at the corner of the property near the FWY off ramp. This SC "should be all operational by the end of the month" I was told.

One unsuspecting Tesla driver plugged in (not drawing power) as the wires to that bollard had not yet been pulled (see my pic, which prompted me to stop, get out & interrogate the construction crew).

I confirmed that many Caruso properties will feature Tesla Superchargers with DEDICATED TESLA PARKING, if ICE'd they will tow. I was there as a Caruso exec informed the contractor to install signage on all SC spots stating so, not the 1/2 dedicated & 1/2 prefered signage called for in the plans.

Expansion of SCs at The Grove and Glendale Americana shopping centers
Installation at the Palisades Village off Sunset in West LA
and of course The Commons at Calabasas (in a seperate TMC thread)
ALL OPPERATIONAL BY SEPTEMBER
Discusset this all on Talking Tesla episode 120 (recorded yesterday)