Weedblossom
Member
FWIW and me having some time on my hands. I called the Tesla line. The SA was able to look at the factory side of things and said my car is still scheduled to be built November-December 2022 (he said he normally don’t disclose this but since my EDD is looking kind of ridiculous he told me it). He said the date I see is most likely an error and he will send an e-mail to the operations team to double check and hopefully update the EDD within 72 hours. Take this with a heaping serving of salt. We shall see, I’m not in a major rush but 2023 is ridiculous and I prefer the LR. I’m sure if all of us wanted we can switch to a P and get a vin within the week lol.