Hopefully they put some signs there to remind people.
Are those stalls open to all brands or just Tesla?
Tesla only for now
They are open to no one at this time, obviously. This site is on list of co-funded sites so at some point will be open to all CCS2 cars. This may or may not be from day dot of opening.
 
Have any cofunded Tesla SC sites been open to non Tesla from day dot?

Albury?
 
Dropped by the site this afternoon. Limited progress wasn't worth pics. Concrete has been poured around the conduits for the HV units but still needs a pour for the plinth to mount the cabinets. Roadside has been prepared to pour concrete with formwork in for the stalls and paths. Nothing on site other than that. Electrics and cable reels will be next once the concreting is ready. Won't be ready for school holidays obviously. Looks like a minimum of 2-3 weeks of work still to come.
 
Nothing visible. I think that will come once the site is more finished. Lots of concrete to go in yet. As previously suggested, over head from the existing infrastructure is the likely application. No trenching to bring it from the existing ground infrastructure which would have happened before they lay the concrete. One thing I did notice was the fencing enclosing the site did run for a distance past the stalls to the corner of Wynter and Macquarie Sts with nothing there but grass. Fence at the other end butts right up to the stall locations. May mean nothing.
 
  • Like
Reactions: Wol747
Drove past today. Still alot to do in Taree site.
 

Attachments

  • IMG_3997.jpeg
    IMG_3997.jpeg
    816.8 KB · Views: 18
  • IMG_3996.jpeg
    IMG_3996.jpeg
    719.5 KB · Views: 10
So not just going to the pole directly across the road.
The temp fencing and orange barriers on the residential side seem to fit in with the orange zone in the BYD screenshot in post #32. The 2 black dots within the orange zone are the electric poles.

The DitchWitch horizontal boring will need an exit point on the other side. This will involve digging a hole down to the drill which may then involve other services such as town water/sewerage/gas/telephone/NBN. As there is also angled parking on that side, maybe they need to fence off an adequate area for the trucks/earthmoving/trades.


Someone may want to do a BYD search for other services in that section of works.
 
Does anyone have Taree flood data from 2021 when Taree was flooded?
I think Albert st (the next street parallel to Wynter and on the other side of Taree Park was flooded (maybe not at the Park)

The flood went up to some of the lower parts of Victoria Street (the main street) near the bridge and part of Pulteney St up to Albert Lane - but not up to the two big shopping centres or Wynter St which is 2 blocks up.
 
  • Informative
Reactions: Quickst