Syd
Member
Do remember that a large set of supercharges is quite a load on a local substation. And the expanded mall I am sure is already stressing the feeders to that area. PECO may need to plan how to feed this thing. (20 stalls = 10 superchargers at 130KW each (once at DC) so expect 140KW at AC, thats a 1.4MW feed, which is a healthy load on a substation. All depends on how much capacity is left on the feeders to that area.