Healy
Member
I'm still not even in production. Getting tense. My DS claims no knowledge of timing other than soonJust as I was about to call my DS I noticed that my status changed from "In Production" to "In Transit". It's on a train and headed to the east coast!
That puts me at:
Ordered: 6/28
Confirmed: 7/6
VIN: 7/6
Production start: 7/19
Production end: 7/22